Olmsted Locks and Dam

The Olmsted project utilized a first-in-the US “in-the-wet” method to build two 110’ by 1200’ locks and a dam comprised of five tainter gates, 1,400’ of boat-operated wickets and a fixed weir. Concrete shells, weighing as much as 2,700 tons, produced at an on-site precast yard were attached to lifting frames. A 5,000-ton gantry crane […]