Lucas Oil Stadium

Hillsdale Fabricators was the prime steel contractor responsible for the fabrication and erection of more than 15,500 tons of structural steel for this retractable roof stadium that is home to the NFL’s Indianapolis Colts. The stadium’s retractable roof was the first to part lengthwise and boasts an operable glass window wall, allowing for a spectacular […]

Chrysler Toledo Assembly Plant Paint Shop and Body Shop

Chrysler challenged the Alberici/Hillsdale team to apply the “Low-Cost Building Strategy” to this project. The application would dramatically reduce the comparable cost of assembly plant facilities and subsequently reduce the cost of automobile manufacturing. Traditionally, the cost to build a manufacturing facility is $85/SF. The team worked in tandem with the architect and Chrysler to […]

C-5 Fuel Cell, Corrosion Control and Maintenance Hangars

The C-5 Hangar Facility for the 164th Airlift Wing of the Tennessee Air National Guard accommodates eight C-5 Galaxy cargo planes that support military and humanitarian operations throughout the world. The project featured construction of a new maintenance hangar, corrosion control hangar, fuel cell hangar, and associated support facilities totaling approximately 330,000 square feet. In […]

BJC North Campus Integration Project

Hillsdale Fabricators performed structural steel fabrication and erection for the 614,000-square foot BJC North Campus Integration Project, which created both the Center for Advanced Medicine and Alvin J. Siteman Cancer Center. Stringent seismic requirements of the building code for called for the support of a sophisticated structural steel system. Hillsdale responded to the challenge with […]