Hillsdale fabricated, preassembled, and shipped the 156-foot-long tied-arch bridge to replace the 103-year-old Halsted Street bascule bridge over the Chicago River North Branch Canal. The bridge features a 156-foot-long, 180-foot-wide steel tied arch main span flanked by two 36-foot precast concrete arch approach spans. The new bridge deck is 22 feet wider than the old […]
Halsted Street Bridge
Transportation
Barge Shipping
Posted on Posted on