GM Lansing Delta Township Assembly Complex
Lansing, Michigan
Steel
13,500 Tons
Size
1.7 Million square feet
Owner
General Motors Company
Alberici Constructors for General Motors Company
Hillsdale fabricated and erected 13,500 tons of structural steel for the world’s first LEED certified automotive assembly plant – General Motors-Lansing Delta Township. This 1.7 million-square-foot, is a campus-style automotive assembly facility comprised of a body shop, general assembly, administration building, and visitors arrival center interconnected by 101,000 square-feet of elevated conveyor/utility trestles. Raw coiled steel is stamped at one end of the facility and is conveyed through welding, painting, and assembly areas before exiting as a finished vehicle at the other end of the facility.