GM Lansing Delta Township Assembly Complex

Lansing, Michigan

Steel

13,500 Tons

Size

1.7 Million square feet

Owner

General Motors Company

Alberici Constructors for General Motors Company

Hillsdale fabricated and erected 13,500 tons of structural steel for the world’s first LEED certified automotive assembly plant – General Motors-Lansing Delta Township. This 1.7 million-square-foot, is a campus-style automotive assembly facility comprised of a body shop, general assembly, administration building, and visitors arrival center interconnected by 101,000 square-feet of elevated conveyor/utility trestles. Raw coiled steel is stamped at one end of the facility and is conveyed through welding, painting, and assembly areas before exiting as a finished vehicle at the other end of the facility.

Services

  • Steel Fabrication
  • Steel Erection
  • Coatings